Skip to content
donelson construction logodonelson construction logo
  • Home
  • About Us
  • PressurePave®
    • Longevity
    • The Sealant
    • PCI Rating
    • About The Inventors
    • Before and After Photos
  • ChipLock
  • Videos
  • Contact

Our Projects

Before/After

2019

2020

2021

road with major alligator cracks next to a highway

2019

recently paved road next to a highway with double solid yellow striping

2020

road next to a hill and highway after winter

2021

alligator cracked street with yellow broom truck sweeping next to a pickup truck with flashing lights

2019

road with church

2021

road with milled cross-walk bars

2019

crosswalk

2021

Cracked road with old crack fill next to a tree

2019

2021

2019

2021

2019

2021

old beat up road with major cracks at the bottom of the image

Before

paved road with double yellow stripe down the middle

After 4 Months

old residential road

Before

residential road paved

After 4 Months

old cracked road with a truck pulled off to the side of the road in front of a house

Before

paved road with two cars pulled of to the side of the road in front of a house

After 4 Months

old beat up road with faded double yellow line in the middle

Before

beautiful paved road with yellow double lines

After 4 Months

straight endless road with yellow line down the center

Before

endless paved road with double line down the center

After 4 Months

curved road with cracks

Before

nice road with a curve at the end

After 4 Months

Wide curved road

Before

bend road

After 4 Months

cracked road

Before

after image of road with trees off to the left of the image

After 4 Months

Before

after image of paved road

After 4 Months

PressurePave®
Longevity
The Sealant
PCI Rating
the Inventors
1075 Wise Hill Road, MO 65631, Missouri, USA | Phone: (417) 743-2694
Copyright © 2023 Donelson Construction Company, LLC.
  • Privacy Policy
  • Terms
  • Affiliates
  • Trademarks